Evaluation of the Factors Influencing Time and Cost Overruns in Telecom Tower Construction in Ghana

Humphrey Danso, John Kobina Antwi

Abstract


This paper, sought to empirically evaluate the factors influencing time and cost overruns of the telecom tower construction projects in Ghana. It involved a cross-sectional survey that used a self-administered structured questionnaire administered to sixty seven respondents of telecom tower construction professionals. The study found 15 major factors influencing time overruns and 14 major factors causing cost overruns in telecom tower construction projects. It also revealed that telecom tower construction projects executed between 1992 and 2011 experienced as much as 82% time overruns, and the cost of the projects increased by 50%. The paper contributes to the general body of knowledge in the area of project management particularly in Ghana’s construction industry. Recommendations are also made for clients, contractors and consultants to alleviate delays in the construction of telecom tower construction projects.

Keywords: cost overruns, evaluation, telecom tower construction, time overruns


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: CER@iiste.org

ISSN (Paper)2224-5790 ISSN (Online)2225-0514

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org