Prediction Model for Construction Cost and Duration in Jordan
Abstract
Risk is mitigated in the course of reliable prediction. A probabilistic model is proposed to predict the risk effects on time and cost of construction projects. Project managers and consultants can use the model in estimating project cost and duration based on historic data. Statistical regression models and sample tests are developed using real data of 140 projects. The research objective is to develop a model to predict project cost and duration based on historic data of similar projects. The model result can be used by project managers in the planning phase to validate the schedule critical path time and project budget. Research methodology is steered per the following progression: i) Conduct nonparametric test for project cost and time performance. ii) Develop generic multiple-regression models to predict project cost and duration using historic performance data. iii) The percent prediction error is statistically analyzed; and found to be substantial; thus, iv) Custom multiple regression models are developed for each project type to obtain statistically reliable results. In conclusion, the 95% point estimation of error margin= ±0.035%. Therefore, at a probability of 95%, the proposed model predicts the project cost and duration with a precision of ±0.035% of the mean cost and time.
To list your conference here. Please contact the administrator of this platform.
ISSN: 1993-0461 ISSN: 2225-157X,
Edited and Published by Jordan University of Science and Technology, P.O.Box 3030, Irbid 22110, Jordan
Mailing address: Prof. Fouad Gharaybeh, Ph.D.
Editor-in-Chief Civil Engineering Department Jordan University of Science and Technology Irbid 22110, Jordan Tel. No. + 962 2 7201000 ext. 22104 Fax No. + 962 2 7201073
Submission & Subscriptions E-mail:jjce@just.edu.jo