Heuristic Approach for n-Jobs, 3-Machines Flow Shop Scheduling Problem, Processing Time Associated With Probabilities Involving Transportation Time, Break-Down Interval, Weightage of Jobs and Job Block Criteria
Abstract
This paper deals with a new simple heuristic algorithm for n jobs, 3 machines flow shop scheduling problem in which processing times are associated with their corresponding probabilities involving transportation time, break down interval and job block criteria. Further jobs are attached with weights to indicate their relative importance. A heuristic approach method to find optimal or near optimal sequence minimizing the total elapsed time whenever mean weighted production flow time is taken into consideration. The proposed method is very easy to understand and also provide an important tool for decision makers. A numerical illustration is also given to clarify the algorithm.
Keywords: Flow shop scheduling, Processing time, Transportation time, Breakdown interval, Weights of job, Optimal sequence
To list your conference here. Please contact the administrator of this platform.
Paper submission email: MTM@iiste.org
ISSN (Paper)2224-5804 ISSN (Online)2225-0522
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org