Installation, Testing and Jointing of LT and HT Power Cables up to 33 KV

Er. Parveen Kumar Goyal

Abstract


In the electrical power distribution and transmission system for urban and rural area, overhead lines are usually in major practice. Underground system was not favourable in developing and under developed countries. The main reason behind it was the much higher capital investment of underground cabling with respect to overhead bare conductors. But with the advancement in technology and market competition its cost is manageable for urban areas. This system requires more skills and planning for installation, jointing and termination rather than overhead lines. The presented paper is applied on power distribution system up to 33 KV.

Keywords: LT/HT power cables, Installation, Jointing, Termination, Testing.


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: IEL@iiste.org

ISSN (Paper)2224-6096 ISSN (Online)2225-0581

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org