Author Details

Gupta, Deepak

  • Vol 1, No 1 (2011) - Articles
    Bicriteria in n x 2 Flow Shop Scheduling Under Specified Rental Policy, Processing Time and Setup Time Each Associated with probabilities Including Job Block
    Abstract  PDF
  • Vol 1, No 2 (2011) - Articles
    Bicriteria in n x 3 Flow Shop Scheduling Under Specified Rental Policy, Processing Time Associated with Probabilities including Transportation Time and Job Block Criteria
    Abstract  PDF
  • Vol 1, No 2 (2011) - Articles
    Constrained Flow Shop Scheduling with n-Jobs, 3-Machines, Processing Time Associated with Probability involving Transportation Time, Breakdown Interval and Weightage of Jobs
    Abstract  PDF
  • Vol 2, No 1 (2012) - Articles
    Application of Branch and Bound Technique for 3-Stage Flow Shop Scheduling Problem with Transportation Time
    Abstract  PDF
  • Vol 2, No 3 (2012) - Articles
    The Idle/Waiting Time Operator With Applications To Multistage Flow shop Scheduling To Minimize The Rental Cost Under Specified Rental Policy Where Processing Times Are Associated With Probabilities Including Transportation Time
    Abstract  PDF


Paper submission email: IEL@iiste.org

ISSN (Paper)2224-6096 ISSN (Online)2225-0581

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org