Idle / Waiting Time Operator Oi,w Of An Equivalent Job For A Job Block Criteria To Minimize The Rental Cost In Two Stage Flow Shop Scheduling, the Processing Time Associated With Probabilities

Deepak Gupta, Sameer Sharma, Naveen Gulati, Harminder Singh

Abstract


The present paper is an attempt to study the n x 2 flow shop production scheduling problem in which the processing times are associated with their respective probabilities and follows some restrictive rental policy including equivalent job block criteria. The objective of the study is to get optimal sequence of the jobs in order to minimize the rental cost using idle/waiting time operator through the iterative algorithm. The operator technique is an easy approach in economical and computational point of view and gives an optimal schedule rule in order to minimize the rental cost of the machines. The model is justified by a computer programme followed by a numerical illustration.


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: ISDE@iiste.org

ISSN (Paper)2222-1727 ISSN (Online)2222-2871

1Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org