Introducing a Manipulated System of Drainage Basins of a Developing Countries
Abstract
As a natural open system, in a drainage basin, there is water flow and balanced channel characteristics. In a manipulated channel system, however, according to Mrowka (1974) and Schumm (1977), the water flow is made under control that induces dynamics in channel characteristics. In this paper, attempt is made to uncover how channel project is caused, nature of the new forms of channel cross-sectional area, shape, sinuosity, and gradient, as well as flood-plain characteristics. It also covers the peculiar transformation evolved as drainage basin system is changed to channel project. Consequently in the paper, two tasks involved were explained. These are significant channel re-construction, and redirection of stream flow as relates to developing water terrace in the savanna zone of Nigeria with the increased channel project dated back 1970s (Olofin, 1980). Specifically, the paper drew considered the physical characteristics of the natural channel of River Suka in North Central Nigeria and the manipulated system or the new face of the drainage basin project of the Kano River, Nigeria used to structure the Tiga dam that involved downstream channel adjustments
Keywords: drainage basin, channel, river, dam, downstream
To list your conference here. Please contact the administrator of this platform.
Paper submission email: JEES@iiste.org
ISSN (Paper)2224-3216 ISSN (Online)2225-0948
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org