Geotechnical Investigation of Road Failure along Ilorin-Ajase –Ipo Road Kwara State, Nigeria.
Abstract
The incessant failure of road network in Nigeria has generated a lot of concern by road users and government. Apart from lives and properties that are lost annually to road crashes, road rehabilitation across the country has become a financial burden to the federal government. Several factors have been identified to be responsible to road failure in Nigeria; they include geological, geomorphological, road usage, bad construction and wrong approach to maintenance. Hence, this paper examines some of the factors responsible for road failure along Ilorin-Ajase Ipo road, Kwara State Nigeria. Soil samples were collected from Five (5) portions of the road that are badly affected by road failure. These portions include: Agricultural and Rural Management Training Institute (ARMTI) 17+800km, Kabba Owode 18+00Km, Idofian 23+700Km, Koko 29+700Km and Omupo 35+700Km axis. The soil samples collected were analyzed four engineering properties: particle size distribution (PSD),atterberg limit, compaction test California Bearing Ratio (CBR). The result of Principal components indicated that, in the study area sandy soil contribute 50%,Coefficient of curvature account for 28.1% and coefficient of Uniformity 14.1%.T he overall results showed that poor foundation materials and poor Engineering construction have affected the rate of failure of the road along Ilori –Ajase Ipo road.
To list your conference here. Please contact the administrator of this platform.
Paper submission email: JEES@iiste.org
ISSN (Paper)2224-3216 ISSN (Online)2225-0948
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org