Analysis of Cost Deviations in Road Construction Activities: A Case Study from Palestine.

Ibrahim Mahamid

Abstract


This study investigates the statistical relationship between actual and estimated cost of road construction activities. It is based on a sample of 100 road construction projects awarded in the West Bank in Palestine over the years 2004 - 2008. Based on this data, regression models were developed. The investigated construction activities in this study are earthworks, base works, asphalt works and furniture works. The findings reveal that the average cost deviation in the investigated activities is as follows: earthworks= -15.7%, base works = 12.9%, asphalt works = 18.5% and furniture works = 36.4%. The relationship between cost divergence of each investigated activity and physical project characteristics (i.e. project size, terrain condition, ground condition and soil quality) is discussed.

Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

ISSN: 1993-0461   ISSN: 2225-157X,

Edited and Published by Jordan University of Science and Technology, P.O.Box 3030, Irbid 22110, Jordan

Mailing address: Prof. Fouad Gharaybeh, Ph.D.

Editor-in-Chief Civil Engineering Department Jordan University of Science and Technology Irbid 22110, Jordan Tel. No. + 962 2 7201000 ext. 22104 Fax No. + 962 2 7201073

Submission & Subscriptions E-mail:jjce@just.edu.jo