Bicriteria in n x 2 Flow Shop Scheduling Problem under Specified Rental Policy, Processing Time, Setup Time Each Associated with Probabilities Including Job Block Criteria and Weightage of Jobs

Sameer Sharma, Deepak Gupta, Seema Sharma, Shefali Aggarwal

Abstract


This paper is an attempt to obtain an optimal solution for minimizing the bicriteria taken as minimization of the total rental cost of the machines subject to obtain the minimum makespan for n-jobs, 2-machine flow shop scheduling problem in which the processing times and independent set up times are associated with probabilities including job block criteria. Further jobs are attached with weights to indicate their relative importance. The proposed method is very simple and easy to understand and also provide an important tool for the decision makers. A computer programme followed by a numerical illustration is given to justify the algorithm.

Keywords: Flowshop Scheduling, Heuristic, Processing Time, Setup Time, Job Block, Weighs of jobs


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: CEIS@iiste.org

ISSN (Paper)2222-1727 ISSN (Online)2222-2863

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org