Author Details

Sharma, Sameer

  • Vol 3, No 2 (2011) - Articles
    Minimizing Rental Cost under Specified Rental Policy in Two Stage Flow Shop, the Processing Time Associated with Probabilities Including Break-down Interval and Job – Block Criteria
    Abstract  PDF
  • Vol 3, No 3 (2011) - Articles
    Optimal Two Stage Flow Shop Scheduling to Minimize the Rental Cost including Job Block Criteria, Set Up Times and Processing Times Associated with Probabilities
    Abstract  PDF


Paper submission email: EJBM@iiste.org

ISSN (Paper)2222-1905 ISSN (Online)2222-2839

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org