Sharma, Sameer
-
Vol 3, No 2 (2011) - Articles
Minimizing Rental Cost under Specified Rental Policy in Two Stage Flow Shop, the Processing Time Associated with Probabilities Including Break-down Interval and Job – Block Criteria
Abstract
PDF
-
Vol 3, No 3 (2011) - Articles
Optimal Two Stage Flow Shop Scheduling to Minimize the Rental Cost including Job Block Criteria, Set Up Times and Processing Times Associated with Probabilities
Abstract
PDF
Paper submission email: EJBM@iiste.org
ISSN (Paper)2222-1905 ISSN (Online)2222-2839
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org