The Idle/Waiting Time Operator With Applications To Multistage Flow shop Scheduling To Minimize The Rental Cost Under Specified Rental Policy Where Processing Times Are Associated With Probabilities Including Transportation Time

Deepak Gupta, Harminder Singh

Abstract


This paper is an attempt to study nX3 flow shop production scheduling problems in which the processing time is associated with their respective probabilities transportation time and job block criteria. The objective of the study is to get optimal sequence of the jobs in order to minimize the rental cost using idle/waiting time operator through iterative algorithm

Keywords: key words, orkforce sizing, job-shop production, holonic model


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: IEL@iiste.org

ISSN (Paper)2224-6096 ISSN (Online)2225-0581

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org