Determine The Optimal Sequence - dependent Setup Cost and / or Setup Time for Single Demand with Multiple Products Using Modified Assignment Method

Watheq H. Laith, Swsan S. Abed Ali, Mahmoud A. Mahmoud

Abstract


Sequencing is the most impact factor on the total setup cost and / or time and the products sequences inside demands that consist from muti-products . It is very important in assembly line and batch production . The most important drawback of existing methods used to solve the sequencing problems is the sequence must has a few products and dependent setup cost or setup time . In this paper we modify the assignment method –based goal programming method to minimize the setup cost and / or setup time. The main advantage of this new method , it is not affected by the number of products in the sequence and can treatment the sequence problems with two or more objectives .

Keywords: products sequences , setup cost , setup time , travel salesman problem (TSP ) , modified assignment method , goal programming .


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: IEL@iiste.org

ISSN (Paper)2224-6096 ISSN (Online)2225-0581

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org