Determine The Optimal Sequence - dependent Setup Cost and / or Setup Time for Single Demand with Multiple Products Using Modified Assignment Method
Abstract
Sequencing is the most impact factor on the total setup cost and / or time and the products sequences inside demands that consist from muti-products . It is very important in assembly line and batch production . The most important drawback of existing methods used to solve the sequencing problems is the sequence must has a few products and dependent setup cost or setup time . In this paper we modify the assignment method –based goal programming method to minimize the setup cost and / or setup time. The main advantage of this new method , it is not affected by the number of products in the sequence and can treatment the sequence problems with two or more objectives .
Keywords: products sequences , setup cost , setup time , travel salesman problem (TSP ) , modified assignment method , goal programming .
To list your conference here. Please contact the administrator of this platform.
Paper submission email: IEL@iiste.org
ISSN (Paper)2224-6096 ISSN (Online)2225-0581
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org