Bicriteria in n x 2 Flow Shop Scheduling Under Specified Rental Policy, Processing Time and Setup Time Each Associated with probabilities Including Job Block
Abstract
This paper is an attempt to obtains an optimal solution for minimizing the bicriteria taken as minimizing thetotal rental cost of the machines subject to obtain the minimum makespan for n jobs 2 machines flowshopproblem in which the processing times and independent set up times are associated with probabilitiesincluding the job block concept. A heuristic approach method to find optimal or near optimal sequence hasbeen discussed. The proposed method is very simple and easy to understand and also provide an importanttool for the decision makers. A computer programme followed by a numerical illustration is give to clarifythe algorithm.
Keywords: Flowshop Scheduling, Heuristic, Processing Time, Set Up Time, Rental Cost and Job Block.
To list your conference here. Please contact the administrator of this platform.
Paper submission email: IEL@iiste.org
ISSN (Paper)2224-6096 ISSN (Online)2225-0581
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org