Applicability of Heuristic Approach in Planning and Scheduling Project
Abstract
This paper focuses on the application of heuristic approach in solving scheduling problems of ongoing project. This study is primarily aimed at providing a suitable heuristic for finding an optimum resource level, which ought to be kept over the project execution period, and a sensitivity analysis of which resource type ought to be increased in order to reduce the project completion time towards the ultimate. The use of resource utilization and a “constraining index” in the search for optimal solutions to this problem of meeting delivery date requirements, and optimize utilization of multiple resources in project and minimize other resources.
Keywords: Heuristic; resource constraints; constraining index.
To list your conference here. Please contact the administrator of this platform.
Paper submission email: IEL@iiste.org
ISSN (Paper)2224-6096 ISSN (Online)2225-0581
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org