Minimizing Rental Cost under Specified Rental Policy in Two Stage Flowshop Set Up time, Processing Time Each Associated with Probabilities Including Break-down interval and Job Block Criteria

Sameer Sharma

Abstract


This paper is an attempt to study two stage flow shop scheduling problem in which the processing times and independent setup times each associated with probabilities of the jobs are considered to minimize rental cost under specified rental policy including break-down interval and equivalent job-block criteria. The study gives an optimal schedule for the problem. The method is justified with the help of numerical example and a computer program.

Keywords: Equivalent-Job, Rental Policy, Makespan, Elapsed Time, Idle Time, Breakdown Interval, Utilization Time


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: JETP@iiste.org

ISSN (Paper)2224-3232 ISSN (Online)2225-0573

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org