Branch and Bound Technique for three stage Flow Shop Scheduling Problem Including Breakdown Interval and Transportation Time

Deepak Gupta

Abstract


This paper deals with minimization of the total elapsed time for nx3 flow shop scheduling problem in which the effect of breakdown interval and the transportation time are considered. A Branch and Bound technique is given to optimize the objective of minimize the total elapsed time. The algorithm is very simple and easy to understand and, also provide an important tool for decision makers to design a schedule. A numerical illustration is given to clarify the algorithm.

Keywords: Flow shop scheduling, Processing time, Transportation time, Branch and Bound Technique, Optimal sequence.


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: JIEA@iiste.org
ISSN (Paper)2224-5782 ISSN (Online)2225-0506
Please add our address "contact@iiste.org" into your email contact list.
This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.
Copyright © www.iiste.org