Application of Idle/ Waiting Time Operator Oi,W on Two Stage Flow Shop Scheduling Problem with Arbitrary Lags

Deepak Gupta, Harminder Singh, Renuka .

Abstract


In this paper an attempt is made to study n jobs over two machines where processing times are associated with respective probabilities and also Idle/Waiting Time Operator Oi,w is used for equivalent job block as well as transportation time in addition with arbitrary lags i.e. start lag or stop lag. The objective of the study is to propose an algorithm by which we can minimize the total elapsed time in two stage flow shop scheduling with considering various system parameters. A numerical illustration is also given to clarify the proposed concept.

Keywords: Flow shop, Start Lag, Stop Lag, Transportation Time, idle waiting operator.

Subject Classification Number: 90B35, 90B36.


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: NCS@iiste.org

ISSN (Paper)2224-610X ISSN (Online)2225-0603

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org