Resource Schedule of Concrete Fish Pond Construction Using Network Analysis

Akomolafe A. A.

Abstract


In the construction of building, preparation of bid, maintenance and planning of oil refinery and preparation for agricultural activities, there is a need to know the completion days of the project without delay and the earliest time and the latest time for which each activity will take. It was based on this that we decide to analyze the construction of concrete fish pond using Network Analysis through the use of Critical Path Method (CPM) and Program Evaluation Review Technique (PERT). Sixty-four days was arrived at for the completion of the construction using CPM while sixty-eight days with 99% probability was arrived at using PERT method. In deciding which of the method is best suitable for the construction of the fish pond, PERT serve as the best method due to the fact that it considers the Pessimistic Time (longest time possible and can be seen as usual delay) and Optimistic Time (shortest time possible if things go perfectly) as well as the probability [which is 99%] of completing the task within a specific time. The result established some useful facts for researchers in this area as well as managers of industry in carrying out their study from the feasibility stage to the other stages so as to have a good practical target towards the completion of the project as planned.

Keyword: Network Analysis, Critical Path Method, Program Evaluation Review Technique, Pessimistic Time, Optimistic Time and Probability

DOI: 10.7176/JMCR/57-04

Publication date:June 30th 2019


Full Text: PDF
Download the IISTE publication guideline!

To list your conference here. Please contact the administrator of this platform.

Paper submission email: JMCR@iiste.org

ISSN 2422-8451

Please add our address "contact@iiste.org" into your email contact list.

This journal follows ISO 9001 management standard and licensed under a Creative Commons Attribution 3.0 License.

Copyright © www.iiste.org